top of page
1.png

Melanie’s Restaurant | Williston, Florida

Patriot Demolition was contracted to safely demolish Melanie’s Restaurant after a kitchen fire caused significant structural damage and the building was deemed unsafe. The priority for this project was rapid response, site safety, and responsible material handling.

white background.png

Our team managed the full demolition of the fire damaged structure, addressing compromised materials and unstable conditions with a controlled and methodical approach. Careful planning ensured the surrounding area remained protected while the building was removed efficiently and in compliance with local requirements.

As part of Patriot’s commitment to responsible demolition practices, all concrete, brick, and metal generated during the project were recycled. This approach reduced waste and supported sustainable disposal methods while fully clearing the site and preparing the property for its next phase in Williston.

​READY TO GET STARTED? JUST GIVE US A CALL AT 1-352-789-4487

Logo-footer-278w.webp

Hours of Operation:

Monday-Friday: 8am to 4pm

Emergency Service on the Weekends

Our Location:

4400 Southeast 73rd Street

Ocala, FL 34480

©2026 by Patriot Demolition. All rights reserved. • Proudly Designed and Managed by The Ocala Design Group

bottom of page